Dec
  • 12.31
    The grinding plant of Zhujiaqiao Cement Co., Ltd. in Anhui, Mainland China began operating, and its annual slag production capacity was 700,000 tons.
  • 12.31
    No. 1 RSP rotary kiln construction with the annual production capacity of 2.7 million tons at the Hoping Plant was completed.
  • 12.31
    No. 3 shaft construction with the annual limestone production capacity of 7 million tons at the Hoping Quarry was completed. The total annual limestone production capacity increased to 15 million tons at the Hoping Quarry.
  • 12.31
    No. 3 RSP rotary kiln at the Zhudong plant was terminated.