Chronicle of Major Events

2008
Dec
  • 12.31
    A total of four sets of 6,000 t/d clinker production lines and five sets of 150 t/hr cement grinding system for the first and second phase construction at the Guigang plant in Guangxi were completed.
  • 12.31
    The second phase construction of the #2 slag grinding plant at the Liuzhou plant in Guangxi was completed, increasing the annual slag production capacity by 700,000 tons.
  • 12.31
    The second phase construction of the second set of the 6,000 t/d clinker production line and two sets of the 150 t/hr cement grinding systems were completed at the Yingde plant in Guangdong.